The Chemvest project brought together exterior sealing and challenging access, while working around the demands of a busy industrial facility. Located at 1170 Invicta Drive in Oakville, Chemvest is a 27,500-square-foot ingredients warehouse and manufacturing facility, including approximately 5,000 square feet of office space. Operating within a high-demand industrial area of East Oakville, the facility supports food nutrition and ingredients, health and personal care, blending, manufacturing, and packaging operations under the Quadra Group.

Scope

  • Removal and replacement of exterior precast joints
  • Vertical and horizontal precast-to-precast joints
  • Joint sealing down to the base of the building
  • Removal and replacement of sealant at man doors

Working Around an Active Facility

The project began after a consulting group identified that the existing exterior sealant had reached the end of its service life and was separating at the precast-to-precast joints. The solution required removing the deteriorated sealant and installing new sealant throughout the affected joints.

Because Chemvest remained fully operational, the work had to be carefully planned around daily transportation and delivery activity. A scissor lift was selected instead of a zoom boom because the available access route needed to remain open for transport trucks. The work area also required a stable, level surface for the lift, so our team constructed a wood ramp to provide a secure working platform and allow the lift to safely reach approximately 32 feet.

Managing Site Access

Scheduling was an important part of the project. Weekend work provided more room to complete the exterior sealing with fewer transport trucks moving through the area. This allowed the crew to work efficiently while minimizing disruption to the facility’s regular operations.

Keeping The Facility Sealed

Working at a food-related facility adds another important consideration to exterior joint replacement. As sections of existing sealant were removed, they needed to be properly resealed the same day. Maintaining a continuous, secure building envelope was essential throughout the project.

The goal was straightforward: keep the facility protected and maintain the integrity of the building while the work progressed. Beverly Caulking’s team planned the work accordingly and ensured each completed section was properly sealed before moving on.

Practical Problem-Solving

Projects like Chemvest give our team the opportunity to put practical problem-solving and site experience to work. With an active facility, limited access, and changing site conditions, the job required thoughtful planning and a flexible approach. From access planning through to completion, Beverly Caulking adapted to the conditions and completed the work safely and efficiently.

Reliable Commercial Caulkig

Exterior precast joint replacement requires the right materials, equipment, access planning, and installation experience. Beverly Caulking works with commercial and industrial facilities to provide professional caulking and sealing solutions while coordinating around active operations.

If your facility has aging or deteriorated exterior sealant, contact Beverly Caulking to discuss the project and determine the right approach for your building.

Date Completed: December 2025 – April 2026

Categories:  Commercial  | Warehouse

Architect: DEXD 213 Sterling Rd, Suite 206 Toronto ON

Contractor: Royalty General Construction Ltd.